# Director, AI Datacenter Construction — Bitdeer

- Location: Austin, TX (remote)
- Posted pay: $200k–$260k/yr
- Posted: Nov 3, 2026
- Status: open (checked Nov 20, 2026)
- Apply (employer's site): https://bitdeer.breezy.hr/p/ae5736e5a901-director-ai-datacenter-construction
- Employer record: https://visajobs.io/company/bitdeer.md

## Sponsorship history
- Tier: Employer history only
- With this exact title: 0

## Description
About Bitdeer:
Bitdeer is a world-leading technology company for AI and Bitcoin mining infrastructure.
Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers and building AI computational infrastructure to support the AI revolution. Bitdeer handles complex processes involved in computing such as equipment procurement, transport logistics, data center design and construction, equipment management, and daily operations. Bitdeer also offers advanced cloud capabilities to customers with high demand for artificial intelligence.
Headquartered in Singapore, Bitdeer has deployed data centers across multiple countries, including the United States, Norway, Bhutan, and Ethiopia.
To learn more, visit https://ir.bitdeer.com/
We are seeking
We are seeking a Director, AI Datacenter Construction to lead delivery of multiple concurrent AI data center builds across Bitdeer’s U.S. portfolio. Reporting to the President of Global Power Land Infrastructure, you will own construction execution for high-density AI campuses, new builds, and retrofits, from site diligence and design through energization, Level 1–5 commissioning, and turnover to operations, with accountability for safety, schedule, cost, and quality on every site.
You will lead site construction managers and discipline leads, set one delivery playbook across all builds, and manage general contractors, utility partners, and design consultants. The ideal candidate has delivered hundreds of megawatts of critical capacity from the owner’s side at a hyperscaler or AI infrastructure company, has delivered liquid-cooled AI data halls, and can run several sites at once without losing control of cost or schedule.
What you will be responsible for
Multi-Site Construction Leadership
Portfolio Delivery: Lead construction of multiple concurrent AI data center builds, from site diligence and design through energization, commissioning, and ready-for-service (RFS).
Team Leadership: Build, lead, and mentor site construction managers, project managers, and discipline leads, and help recruit hyperscale-experienced talent as the portfolio grows.
Delivery Standards: Standardize construction processes, playbooks, and reporting across sites so each build is faster and more predictable than the last.
Pre-Construction, Design & Power
Design Reviews: Lead multidisciplinary reviews of civil, structural, architectural, electrical, and mechanical design packages to resolve constructability, cost, and schedule issues before they reach the field.
Power & Interconnection: Coordinate substation interconnection, utility and EPC partners, outage planning, and energization milestones, and resolve easement, land, and permitting constraints.
Delivery Models: Execute across self-build, build-to-suit, and colocation/third-party delivery models, including tenant fit-outs.
AI & High-Density Infrastructure
Liquid Cooling: Deliver direct-to-chip liquid cooling and high-density power distribution for GPU/AI workloads.
Fit-Out Integration: Coordinate base-building construction with network, fiber, and rack deployment teams so data halls are ready for compute on schedule.
Retrofits & Conversions: Plan and execute retrofits and conversions of existing facilities into AI-ready capacity while protecting live operations.
Cost, Contracts & Procurement
Budget & EAC: Own site budgets, Estimate at Completion (EAC) forecasts, owner’s contingency, and value engineering across the portfolio.
Change Control: Review and approve contractor change orders and scope changes, requiring clear labor and material splits and Owner-Furnished, Contractor-Installed (OFCI) documentation.
Contractor & Supply Chain Strategy: Select and manage general contractors, electrical contractors, trade partners, and consultants based on regional labor markets and vendor capacity, and direct procurement of long-lead equipment and structural steel.
Tenant & Stakeholder Management
Tenant Requirements: Support Site-Specific Owner Project Requirements (SSOPR) negotiations with hyperscale and AI tenants, and set commissioning frameworks that protect schedule and RFS dates.
Stakeholder Governance: Set clear communication protocols between Bitdeer, tenants, and contractors to reduce silos and speed conflict resolution, and lead site visits for prospective tenants and investors.
Executive Reporting: Report status, risks, and decision options to the President of GPLI and executive leadership, with clear cost, schedule, and risk trade-offs.
Safety, Quality & Turnover
Safety Leadership: Enforce a zero-harm safety culture, including OSHA compliance, Method of Procedure (MOP), Lockout/Tagout (LOTO), and energization safety in live environments.
Quality & Commissioning: Run QA/QC programs, root cause failure analysis (RCFA), and Level 1–5 commissioning so facilities meet design intent and tenant requirements.
Turnover & Compliance: Deliver structured closeout and digital asset handover to operations and client CMMS platforms, and oversee incentive and labor compliance (e.g., IRA/ITC, prevailing wage and apprenticeship).
How you will stand out
Experience: 12+ years in data center, mission-critical, or large-scale construction, including 5+ years leading owner-side hyperscale or AI data center construction.
Multi-Site Scale: Proven delivery of multiple concurrent builds or multi-building campuses totaling 300MW+ of critical capacity, with capital budgets of $1B+.
AI & Liquid Cooling: Hands-on delivery of AI/ML-ready, high-density, or liquid-cooled data centers, including direct-to-chip cooling.
Delivery Models: Experience across self-build, colocation, and third-party data center delivery, including tenant fit-outs.
Technical Breadth: Working knowledge of civil, structural, electrical, and mechanical systems, MV/HV power distribution, substation interconnection, and Level 1–5 commissioning.
Education: Bachelor’s degree in Civil, Structural, Electrical, Mechanical, or Architectural Engineering, Construction Manage

> History, not a promise: past H-1B filings do not mean an employer will sponsor you or a given role. Data: U.S. DOL OFLC LCA disclosure (FY2024–FY2026 for role counts, certified LCAs) and the USCIS H-1B Employer Data Hub. Not legal advice. Methodology: https://visajobs.io/methodology
