# Construction Scheduler — RK&K

- Location: Baltimore, MD
- Posted: May 2, 2025
- Status: open (checked Nov 25, 2026)
- Apply (employer's site): https://myjobs.adp.com/rkkcareers/cx/job/5001119532200
- Employer record: https://visajobs.io/company/rummel-klepper-kahl.md

## Sponsorship history
- Tier: Employer history only
- Occupation (SOC): Project Management Specialists (13-1082)
- Employer's certified LCAs for this occupation in MD, FY2024–FY2026: 0
- …in the whole US: 0
- With this exact title: 0
- Median DOL prevailing wage, level I / II: $68k / $89k

## Description
RK&K is seeking a Construction Scheduler to join our Construction Management team in support of CM, CEI, Design related programs in multiple locations. In this role, you will work as an integral part of our internal Program Management Office. Interacting with internal staff, client project managers, contractors, and project stakeholders to provide critical analysis of incoming schedules and provide analysis reports to monitor key performance objectives and overall performance of each contract and on overall assigned capital improvement projects.
Essential Function
Prepare for and analyze procurement needs; track the status of critical activities
Support work groups in determining needs and logistics for materials and equipment handling, storage and staging
Monitor program milestones and interdependencies
Oversee annual and long-term project planning and schedule updates
Interface and consult with clients to own and progress contracts
Analyze delays using industry accepted methodologies
Provide “advanced warnings” on items impacting the project schedule
Participate in meetings with project teams, clients, owners, and other stakeholders
Required Skills and Experience
Minimum two (2) years’ experience in construction project/program management
Ability to evaluate and develop complex schedules
CPM scheduling experience
Proficient with Primavera P6
Proficiency in Microsoft Office (Excel, Word and Outlook)
Knowledge of contract procedures and principles
Ability to communicate effectively, including strong writing skills
Ability to understand construction logic and sequencing of complex highway and transportation projects
Ability to work periodically in the field around operating equipment
Preferred Skills and Experience
Bachelor’s degree in Construction, Engineering, Architecture, or related technical field
Two (2) years of construction and/or engineering related experience
Experience with Tilos and Procore
Physical Demands
This role requires the ability to perform field inspections on active construction sites. The employee must be able to stand and walk for extended periods, navigate uneven terrain, and climb ladders or stairs. Ability to lift and carry inspection equipment and materials weighing up to 20–30 pounds on an occasional basis, with or without reasonable accommodation. Work is performed outdoors in varying weather conditions and may include exposure to construction-related hazards.
Other Duties
Please note this job description is not designed to cover or contain a comprehensive listing of activities, duties or responsibilities that are required of the employee for this job. Duties, responsibilities and activities may change at any time with or without notice.
What We Offer
RK&K offers excellent potential for career advancement and professional growth. We also offer attractive compensation packages commensurate with experience and a comprehensive benefits package including:
Paid time off
Hybrid work (home and office)
Tuition reimbursement
Health, dental, vision, life and disability insurances
Matching 401(k) plan
Paid Holidays
Much, much more!
Why RK&K?
As a full-service engineering and construction management firm, RK&K gives you the opportunity to directly impact the communities in which we live and work. What sets RK&K apart is an award-winning culture that has fostered a spirit of collaboration and trust for over 100 years. To its clients, the firm delivers concepts, processes, and outcomes that are designed for success. RK&K has earned its reputation as a trusted partner, responsive employer, and community steward.
Design your career at RK&K, Apply Today!

> History, not a promise: past H-1B filings do not mean an employer will sponsor you or a given role. Data: U.S. DOL OFLC LCA disclosure (FY2024–FY2026 for role counts, certified LCAs) and the USCIS H-1B Employer Data Hub. Not legal advice. Methodology: https://visajobs.io/methodology
