# Audio Visual Project Manager — TEKsystems

- Location: New Haven, CT
- Posted pay: $65–$75/hr
- Posted: Nov 10, 2026
- Status: open (checked Nov 25, 2026)
- Apply (employer's site): https://careers.teksystems.com/us/en/job/TESYUSJP006411499ENUS
- Employer record: https://visajobs.io/company/teksystems-global-services.md

## Sponsorship history
- Tier: Employer history only
- With this exact title: 0
- Staffing / consulting firm: 26% of its H-1B applications place workers at client sites (FY2024–FY2026)

## Description
**this is a 6 month rolling contract that sits onsite in New Haven, CT with hybrid flexibility. This person needs a background in Project Management, AV PM/ Facilities PM background .** Description The Senior Project Manager, Audiovisual Systems & Capital Projects serves as the lead technical project manager and operational strategist responsible for the full lifecycle delivery of enterprise audiovisual (AV), acoustic, conferencing, and integrated collaboration technologies. Operating at the intersection of Information Technology Services (ITS), Facilities Planning & Construction, and institutional academic/executive stakeholders, this role directs complex, high-visibility capital construction projects as well as enterprise-wide technology modernization initiatives. The position oversees technology deployments across classrooms, lecture halls, libraries, executive boardrooms, and specialized multi-use spaces. The incumbent directs efforts from early architectural programming and schematic design through construction administration, systems commissioning, operational turnover, and lifecycle support governance. In addition to delivering projects on schedule and within budget, the role acts as an institutional anchor: standardizing technical workflows, mitigating cross-functional risks, fostering user adoption, and aligning physical room technology with enterprise IT infrastructure. This role operates beyond traditional audiovisual project coordination, functioning as the primary stabilizing leader for complex, high-risk initiatives characterized by evolving scopes, tight construction timelines, cross-trade interdependencies, and high institutional visibility. Autonomous Program Ownership: Exercises executive-level judgment and independent decision-making across competing priorities, balancing design ideals with budget parameters and site realities without requiring day-to-day tactical supervision. Ambiguity Resolution: Identifies and closes critical gaps in engineering requirements, architectural documentation, scope boundaries, and operational readiness before they result in construction delays, change orders, or compromised user experiences. Influence Without Direct Authority: Unifies diverse stakeholdersincluding academic deans, department chairs, facilities planners, external architects, commercial general contractors, and trade forepersonsinto a singular delivery timeline. Risk Shielding & Disruption Mitigation: Proactively evaluates supply chain volatility, trade handoff sequences, and IT network readiness to insulate the institution from project slippage and operational disruptions. Strategic Advisory: Serves as a trusted institutional advisor to leadership, providing strategic technical roadmaps, capital forecasting, and continuous improvements in delivery standards. Essential Responsibilities 1. Capital Project Scoping, Architectural Integration & Engineering Alignment Lead user requirements discovery and programming interviews with faculty, department chairs, academic registrars, and institutional leadership to establish room functional requirements. Review architectural, structural, and Mechanical, Electrical, and Plumbing (MEP) construction documents (CDs) across all American Institute of Architects (AIA) phases: Schematic Design (SD), Design Development (DD), and Construction Administration (CA). Validate physical pathway infrastructure prior to rough-in and wall closure, ensuring the correct placement and capacity of conduits, junction boxes, floor boxes, poke-throughs, and structural wall blocking/backing. Ensure all audiovisual designs comply with University Facilities Design Standards and ITS infrastructure guidelines. Coordinate with Building Management teams regarding interfaces with Building Automation Systems (BAS), such as Automated Logic, for environmental, lighting, and power-management controls. Partner with enterprise Central IT network teams to coordinate Layer 13 infrastructure readiness, including Category 6A and optical fiber pathway routing, virtual LAN (VLAN) assignments, multicast routing (IGMP snooping, QoS), PoE+ power budgets, and static IP reservations. Serve as the primary ITS technical liaison at weekly Owner-Architect-Contractor (OAC) and MEP trade coordination meetings. 2. Project Portfolio Management, Governance & Financial Control Build, baseline, and manage integrated master project schedules, resource allocations, dependency matrices, and risk registers across multiple concurrent capital initiatives. Develop Rough Order of Magnitude (ROM) estimates during early design and maintain real-time cost models throughout construction phases. Author detailed Scopes of Work (SOW) and Request for Proposal (RFP) packages for competitive bidding among commercial AV systems integrators. Conduct comprehensive bid leveling and de-scoping sessions to audit equipment bills of materials (BOM), labor hours, equipment substitutions, and contractor exclusions. Manage Owner-Furnished Equipment (OFE) procurement, delivery tracking, warehouse staging, and site logistics. Scrutinize contractor Change Order Requests (CORs) against daily superintendent logs and verify monthly Schedule of Values (SOV) progress payment applications against verified field installations. Provide executive-level dashboard reporting, milestone health checks, and budget variance analyses to leadership and project steering committees. 3. Construction Administration & Commercial Contractor Oversight Chair on-site AV kickoff meetings with the General Contractor, electrical forepersons, and low-voltage integrators. Conduct regular on-site quality control inspections and pre-drywall audits to verify backing installation, conduit sizing, low/high voltage separation (NEC compliance), and reflected ceiling clearances. Manage the technical submittal pipeline (shop drawings, riser diagrams, product cut sheets, equipment rack layouts) in coordination with internal AV Design Engineers. Integrate AV milestone

> History, not a promise: past H-1B filings do not mean an employer will sponsor you or a given role. Data: U.S. DOL OFLC LCA disclosure (FY2024–FY2026 for role counts, certified LCAs) and the USCIS H-1B Employer Data Hub. Not legal advice. Methodology: https://visajobs.io/methodology
